
Factory automation · Indonesia
One-stop solution for efficient industrial systems
- 2012
- 42
Specialised in conveyor and material handling, from painting systems to assembly lines. Designed, fabricated and installed to each customer’s needs.
Event · 25 November 2026
Technical Day 2026
- Date and time
- 25 November 202610:00 to 16:00 WIB
- Venue
- Hotel Horison Bekasi, Sky Ballroom, 10th floor
Talks on pretreatment, powder coating, coating automation, painting line technology, factory digitalisation and 3D quality inspection, by Almec and its partners.

Trusted by manufacturers in Indonesia and abroad
All clientsWe have also delivered projects for food and beverage, construction and textile companies.
01Solutions
Our expertise

Conveyor & Material Handling System
Slat, belt, chain, roller and overhead conveyors, screw conveyors and bucket elevators, up to complete assembly lines.

Painting Line System
Powder coating, liquid painting and electro-dipping systems, from pretreatment to the curing oven.

Robotics Integration & Special Purpose Machines
Robot integration, test benches, and machines built for one specific job.

Environmental System (WWT & Air Pollution Control)
RTO, wet and dry scrubbers, and waste water treatment (WWT).
02Projects
Recent projects
- Astra Honda Motor with KinteABS plastic painting line for motorcycle body partsPainting Line System · Robotics Integration & Special Purpose Machines · Conveyor & Material Handling System
- Jemco Manufacturing IndonesiaTurnkey powder coating line for rackingPainting Line System
- Astra Honda MotorEngine main assembly line conveyorConveyor & Material Handling System
- Astra Honda MotorHPDC conveyorConveyor & Material Handling System
- Astra Honda MotorPower train conveyorConveyor & Material Handling System
03Why Almec
- 1
One-stop solution (sales, after-sales and service)
Sales, design, fabrication, installation and after-sales service, all from one team.
- 2
24-hour hotline service (after-sales and service)
Our hotline takes after-sales and service calls 24 hours a day.
- 3
Experience working with several multinational system makers
We have worked with foreign system makers on plants in Indonesia, such as Guangzhou Kinte on painting lines for Astra Honda Motor.
New or renewed painting line or assembly line?
Tell us what you produce and where.
