Solutions

Environmental System (WWT & Air Pollution Control)

PT Almec Indonesia supplies waste water treatment and air pollution control systems for factories in Indonesia, including regenerative thermal oxidisers (RTO), wet and dry scrubbers, cyclones, dust collectors and sludge dryers. Design, fabrication and installation are handled under one roof.

What is included

  • Regenerative thermal oxidisers (RTO)
  • Wet and dry scrubbers
  • Waste water treatment (WWT)
  • Cyclones and dust collectors
  • Sludge dryers

WWT & Air Pollution Control

How the systems connect

A factory sends exhaust air and waste water out by separate routes, and Almec designs, fabricates and installs systems for both. The three drawings show typical arrangements with one set of symbols and one colour code. Each real system is engineered around the plant’s own process.

What is an RTO?

A regenerative thermal oxidiser (RTO) cleans exhaust air that carries solvent fumes, such as the air from paint booths and drying ovens. It heats the air in a combustion chamber until the solvents burn, leaving mainly carbon dioxide and water vapour.

In the simplest design, two ceramic beds hold on to the heat. Clean hot air leaving the chamber warms one bed; valves then turn the flow around, so the incoming air passes through that warm bed and arrives already hot. The burner only makes up the difference.

Fig. 1

Paint booth and oven exhaust, cleaned in an RTO

Air from spraying and drying carries paint mist and solvent fumes. A filter takes out the mist, then the RTO burns the solvents before the air leaves the stack.

Key

  • Untreated or hot gas
  • Treated air
  • Water
  • Sludge
  • Part, see the list
Fig. 1: Paint booth and oven exhaust, cleaned in an RTOFlow diagram. Exhaust from a paint booth or oven passes a dry scrubber or filter, a damper and an exhaust fan. It enters the RTO through one ceramic bed, crosses the combustion chamber, leaves through the other bed and goes up the stack. The numbered parts are described in the list after the drawing.1Paint boothor oven2Dry scrubberor filter3Damper4Exhaust fan5Ceramic bedsand valves6Combustion chamberand burner7Stack
Fig. 1: Paint booth and oven exhaust, cleaned in an RTOFlow diagram. Exhaust from a paint booth or oven passes a dry scrubber or filter, a damper and an exhaust fan. It enters the RTO through one ceramic bed, crosses the combustion chamber, leaves through the other bed and goes up the stack. The numbered parts are described in the list after the drawing.1234567
Fig. 1 Booth or oven exhaust, dry scrubber or filter, fan, RTO, stack. A typical arrangement, not to scale.
  1. 1

    Paint booth or oven

    Exhaust ducts collect the air from spraying and drying, which carries paint mist and solvent fumes.

  2. 2

    Dry scrubber or filter

    Filter stages catch paint mist and dust, which keeps the ceramic beds of the RTO clean.

  3. 3

    Damper

    Sets the airflow, and closes the duct when the line stops or is serviced.

  4. 4

    Exhaust fan

    Draws the air through the filter and pushes it into the RTO.

  5. 5

    Ceramic beds and valves

    Incoming air rises through a bed warmed in the previous cycle. Valves under the beds switch the flow direction at intervals.

  6. 6

    Combustion chamber and burner

    The solvents burn at high temperature. The burner tops up the heat that the beds do not return.

  7. 7

    Stack

    Releases the cleaned air, cooled as it passes back out through the other bed.

Performance figures on request.

Fig. 2

Process exhaust, washed in a wet scrubber

Exhaust that carries soluble or acidic fumes and odours is washed in a packed tower. The scrubbing liquid circulates between the tower and its tank.

Key

  • Untreated or hot gas
  • Treated air
  • Water
  • Sludge
  • Part, see the list
Fig. 2: Process exhaust, washed in a wet scrubberFlow diagram. Fumes rising from a process tank are drawn into a hood and enter the wet scrubber below its packing. Spray nozzles wet the packing and a mist eliminator sits above it. The liquid drains into a recirculation tank, which make-up water tops up, and a pump returns it to the nozzles, with a bleed to waste water treatment. The washed air passes an exhaust fan and leaves through the stack. The numbered parts are described in the list after the drawing.Bleed toFig. 3Make-up water1Capture hood2Packing3Spray nozzles4Mist eliminator5Recirculationtank6Pump7Exhaust fan8Stack
Fig. 2: Process exhaust, washed in a wet scrubberFlow diagram. Fumes rising from a process tank are drawn into a hood and enter the wet scrubber below its packing. Spray nozzles wet the packing and a mist eliminator sits above it. The liquid drains into a recirculation tank, which make-up water tops up, and a pump returns it to the nozzles, with a bleed to waste water treatment. The washed air passes an exhaust fan and leaves through the stack. The numbered parts are described in the list after the drawing.To Fig. 3Make-upwater12345678
Fig. 2 Process exhaust, wet scrubber with recirculation tank and pump, fan, stack. A typical arrangement, not to scale.
  1. 1

    Capture hood

    A hood over the tank or machine captures the fumes where they rise.

  2. 2

    Packing

    The air rises through wetted packing, where the liquid absorbs the soluble or acidic fumes and odours.

  3. 3

    Spray nozzles

    Spread the scrubbing liquid evenly over the packing.

  4. 4

    Mist eliminator

    Catches droplets, so that only air leaves the top of the tower.

  5. 5

    Recirculation tank

    Collects the liquid under the tower. Make-up water tops it up, and a bleed goes to waste water treatment (Fig. 3).

  6. 6

    Circulation pump

    Returns the liquid from the tank to the spray nozzles.

  7. 7

    Exhaust fan

    Draws the air through the hood and the tower.

  8. 8

    Stack

    Releases the washed air.

Performance figures on request.

Fig. 3

Waste water treated, sludge dried

Waste water from the plant is evened out, treated and released. The sludge that settles out is dewatered and then dried, which makes it lighter and easier to handle.

Key

  • Untreated or hot gas
  • Treated air
  • Water
  • Sludge
  • Part, see the list
Fig. 3: Waste water treated, sludge driedFlow diagram. Waste water enters an equalisation tank with a mixer, and a pump feeds the treatment stage, where the water is mixed and settled. Treated water leaves at the top. Sludge from the bottom is pumped to a dewatering unit, drawn as a filter press. The water pressed out, the filtrate, flows back to the equalisation tank, and the pressed cake goes to a sludge dryer. The dried sludge drops into a bin. Where a cyclone is used, the dryer’s vapour passes it on its way to exhaust treatment. The numbered parts are described in the list after the drawing.Waste water inTreatedwater outFiltrateTo exhausttreatment1Equalisationtank2Pump3Treatment stage4Sludgepump5Dewatering(filter press)6Sludgedryer7Cyclone8Driedsludge
Fig. 3: Waste water treated, sludge driedFlow diagram. Waste water enters an equalisation tank with a mixer, and a pump feeds the treatment stage, where the water is mixed and settled. Treated water leaves at the top. Sludge from the bottom is pumped to a dewatering unit, drawn as a filter press. The water pressed out, the filtrate, flows back to the equalisation tank, and the pressed cake goes to a sludge dryer. The dried sludge drops into a bin. Where a cyclone is used, the dryer’s vapour passes it on its way to exhaust treatment. The numbered parts are described in the list after the drawing.Waste waterTreated waterFiltrateTo exhausttreatment12345678
Fig. 3 Waste water, equalisation tank, treatment stage, treated water out; sludge, dewatering with the filtrate returned to the equalisation tank, sludge dryer, dried sludge. A typical arrangement, not to scale.
  1. 1

    Equalisation tank

    Collects waste water from the plant and evens out changes in flow and content. A mixer keeps it uniform.

  2. 2

    Transfer pump

    Feeds the treatment stage at a steady rate.

  3. 3

    Treatment stage

    Drawn here simply as mixing and settling. The actual process is chosen to suit each plant’s waste water.

  4. 4

    Sludge pump

    Feeds the settled sludge from the bottom of the treatment stage into the dewatering unit.

  5. 5

    Dewatering (e.g. filter press)

    Presses much of the water out of the sludge, so that the dryer receives a firm cake. The pressed-out water (filtrate) goes back to the equalisation tank. Drawn here as a filter press.

  6. 6

    Sludge dryer

    A screw moves the cake along a heated trough and drives off the remaining water.

  7. 7

    Cyclone

    Where used, a cyclone spins fine dried particles out of the dryer’s vapour and drops them into the bin; the vapour goes on to exhaust treatment.

  8. 8

    Dried sludge

    Collected in a bin for disposal.

Performance figures on request.

Fig. 4Inside an RTO

Where the heat goes

The air heats up as it passes the first ceramic bed, reaches full temperature in the combustion chamber, and hands its heat to the second bed on the way out. The valves then reverse the flow, so the warm bed heats the next air coming in.

Burning solvents give off heat of their own. The more solvent the air carries, the less the burner has to add; with enough, the RTO runs on the solvents alone.

Key

  • With solvent
  • Without solvent
  • Enough solvent: runs without the burner (autothermal)
Fig. 4: Air temperature through a two-bed RTOLine chart above a cut-away strip of the RTO: inlet, ceramic bed 1, combustion chamber with burner, ceramic bed 2, outlet. The air enters at inlet temperature and heats up through bed 1. Once it is hot enough for the solvents to burn, the cases part: with enough solvent it reaches combustion chamber temperature in the bed; otherwise the burner adds the rest in the chamber, more without solvent than with it. Through bed 2 the air gives up its heat and leaves at an outlet temperature a little above the inlet temperature.TemperatureAdded bythe burnerCombustion chamber temperatureInlet temperatureOutlet temperatureInletCeramic bed 1Combustion chamberCeramic bed 2Outlet
Fig. 4: Air temperature through a two-bed RTOLine chart above a cut-away strip of the RTO: inlet, ceramic bed 1, combustion chamber with burner, ceramic bed 2, outlet. The air enters at inlet temperature and heats up through bed 1. Once it is hot enough for the solvents to burn, the cases part: with enough solvent it reaches combustion chamber temperature in the bed; otherwise the burner adds the rest in the chamber, more without solvent than with it. Through bed 2 the air gives up its heat and leaves at an outlet temperature a little above the inlet temperature.TemperatureBurnerCombustionchamber temperatureInlet temperatureOutlet temperatureBed 1ChamberBed 2
Fig. 4 Air temperature from inlet to outlet in a two-bed RTO; from the combustion chamber on, it is the same in all three cases. A typical profile, not to scale.

How a project runs

Three steps, one team

  1. 01

    Design

    Our engineers turn your requirements into drawings, using SolidWorks and AutoCAD.

  2. 02

    Fabrication

    Our production team manufactures the equipment from the drawings, at our factory in Cikarang. Quality and delivery time are the top priority.

  3. 03

    Installation

    We install the equipment at your plant. Our project management team keeps the scope of work and the schedule on track.

Projects

Related projects

All projects

Padi Hijau BuanaSludge dryer machine

2023

Astra Daihatsu MotorDust collector

2017

Astra Honda MotorSludge dryer Plant 2, modified, Plant 5 step 1 ABS painting line

2017

Questions

Questions about waste water treatment or air pollution control? Ask our sales team.

Planning a similar project?

Tell us what you produce and where.